Analysts halve Nvidia Blackwell cabinet shipment forecasts for 2025 — prediction contrasts AI boom

Analysts halve Nvidia Blackwell cabinet shipment forecasts for 2025 — prediction contrasts AI boom

January 17, 2025



Unnamed industry analysts quoted by DigiTimes have cut their 2025 forecasts for Nvidia GB200-based NVL72 machines by over 50%, which contradicts almost all shipment projections for AI hardware this year. One important catch is that the analysts slashed sales forecasts only for machines based on Nvidia’s Arm processors. Sales of x86-based machines with B200 GPUs for AI and HPC will likely thrive.

Millions of Blackwell AI GPUs to be shipped

The 2025 shipment forecast for GB200 NVL72 cabinets has been lowered from 50,000 – 80,000 to 25,000 – 35,000 units. High-volume shipments will begin in the second quarter and ramp up throughout the year. While the 56% slash looks rather dramatic, it should be noted that 35,000 cabinets with 72 GPUs per cabinet means 2.52 million GPUs will be shipped, which is impressive. Also, these are only Grace Blackwell machines featuring Nvidia’s Armv9-based processors. There will also be Blackwell-accelerated systems running x86 processors.



Source link

You May Also Like…

0 Comments